BENEFITS DERIVED BY DISTRICT ASSEMBLIES FROM THEIR PROJECT CONSULTANTS

Main Article Content

J Ayarkwa
B.K. Baiden
D. Osei-Asibey
C.B.S Sabah

Keywords

Construction Industry

Abstract

Many of the problems in construction at the local level can be traced to consultants who supervise projects on behalf of local government agencies. Consultants therefore need to be evaluated regularly to ensure that they are delivering the expected benefits to their clients. This study seeks to assess the benefits District Assemblies (DAs) in Ghana derive from their consultants who supervise projects funded through the District Assemblies’ Common Fund. The study involved a postal survey of 80 DAs and identified the expected benefits the DAs would like to attain through the services of their consultants and the perceived actual benefits they had received. The one-way analysis of variance (ANOVA) (p=0.05) was used to determine the significance of the differences between the expected and the actual benefits. The findings revealed that, of the documented benefits DAs would expect to receive from the professional services rendered by their consultants, increasing accuracy of project budget estimation, saving cost, minimizing risk through improved tender documents, promoting better communication with clients, and meeting clients’ deadline were considered important benefits by the DAs. There were significant differences between the expected benefits and the level of benefits achieved from consultants. The actual benefits were generally lower than that expected by the DAs. The paper is of value to local government agencies wishing to obtain greater benefits from their project consultants, and consultants wishing to realize their weaknesses for continual improvement.

Abstract 139 | PDF Downloads 159

References

Ahmed, S.M. & Kangari, R. (1995), ‘Analysis of client satisfaction factors in construction industry’, Journal of Management in Engineering, ASCE, Vol. 11, No (2), pp. 36 44.
Banful A. B. (2009), ‘Do Institutions limit Clientelism? A study of the District Assemblies Common Fund in Ghana’. International Food Policy Research Institute.
Bartlett J., Kotrlik, J. & Higgings, C. (2001), ‘Organisation Research, Determining appropriate sample size in survey research’, Information Technology Learning and Performance
Journal, Vol 19, pp 43--49.
Berg, S. (1988), ‘Snowball sampling’, In Encyclopaedia of Statistical Sciences, vol. 8 (Kotz S. and Johnson N.L. eds), pp. 529––532.
Botchway, E. (2000), ‘The assessment of the role of and impact of Human resource base of the District Assemblies for effective utilisation of the District Assemblies common fund’. Un--published MSC thesis. KNUST, Ghana.
Caldwell, J.A. & Hagen, T.D. (1994), ‘Engineering consultants implement TQM’. Quality Progress, Vol. 27 No (1), pp. 57--63.
Chan, A.P.C. & Tam, C.M. (2000), ‘Factors affecting the quality of building projects in Hong Kong’, International Journal of Quality and Reliability Management, Vol. 17 No. (4/5), pp. 423--451.
Chow Lai Kit, S. & Ng, T. (2007),‘A fuzzy gap analysis model for evaluating the performance of
engineering consultants’, Automation in construction, Vol 16, pp 425--435
Cooley, M.S. (1994), ‘Selecting the right consultants’. HR Magazine Vol. 39, No. (8):100––3
District Assemblies Act (1993), ‘Act 462 of Parliament of Ghana’.
District Assemblies Common Fund Act (1993), ‘Act 455 of Parliament of Ghana’.
Federation Internationale Des Ingenieurs Conseils (FIDIC) (1997). Quality--based selection for the procurement of consulting services. Lausanne, Switzerland.
Goetsch, D.L. & Davis, S.B. (2002), ‘Understanding and Implementing ISO 9000: 2000’, 2nd ed., Prentice--Hall, Upper Saddle River, NJ.
Hill, N. Self, B. & Roche, G. (2002), ‘Customer Satisfaction Measurement for ISO 9000:2000’, Butterworth--Heinemann, Oxford.
Murphy, R.J. (2002), ‘Implementing an ISO 9000: 2000 Based Quality Management System: Including Safety and Environmental Considerations, ABS Consulting Press, Rockville, MD.
Ng, S.T. (2005), ‘Performance of engineering consultants in ISO 9000--based quality management systems implementation Engineering’, Construction and Architectural Management Vol. 12, No. (6), pp. 519--532.
Osei--Asibey, D. (2005),‘Implementation of total quality management for District Assemblies Common fund projects at the Atwima District Assembly-- pre contract stage’. Unpublished MSc thesis, KNUST.
Tang, S.L. & Kam, C.W. (1999), ‘A survey of ISO 9001 implementation in engineering consultancies in Hong Kong’, International Journal of Quality and Reliability Management, Vol. 16, No. (6), pp.
562--574.
World Bank report (2004), ‘Presentation on the Tracking of Ghana’s District Assemblies Common Fund Video Conference’: April 14, 2004

Similar Articles

1-10 of 172

You may also start an advanced similarity search for this article.