IS BUILD-OPERATE-TRANSFER (BOT) SYSTEM AN EFFECTIVE INITIATIVE COMPARED WITH TRADITIONAL PROCUREMENT METHOD IN STUDENT HOUSING PROVISION IN AN EMERGING ECONOMY?

Main Article Content

Job Taiwo Gbadegesin
Matthew Oluwole Oyewole

Keywords

BOT, PFI, Student Housing, TPM, Tertiary Institutions

Abstract

BOT is a scheme or private finance initiative (PFI) or alternative procurement method in which a government contractually grants to a private sector entity a concession requiring the entity to obtain financing for design, build and operate a
public facility or infrastructure for a fixed period of time, during which the private entity can recover its costs of construction, plus profit, by charging fees or tools for its use and at the end of the concession period, transfer ownership and operation of the facility back to the government. This paper examines stakeholders’ perception in Nigeria on the effectiveness of BOT as a private finance initiative (PFI) for student housing provision and compares it with traditional procurement method (TPM). It also determines the association between the respondents’ years of experience in BOT procurement and the outcome of assessment based on the identified factor frameworks. To achieve these objectives, questionnaires were administered on a sample of the core professionals and experts who are staff in Physical Planning and Development Units (PPDU), Housing unit, Works and Maintenance sections of the selected tertiary institutions in Nigeria. Data were analyzed using descriptive statistics, Chi-square and t-test. The result indicates higher level of effectiveness in favour of BOT than TPM. It also found that, except for cost/funding, there is a significant relationship between the respondents’ years of experience and other factors. It also found that there is significant difference in the respondents’ assessment of BOT and TPM.

Abstract 352 | PDF Downloads 53

References

Akintoye, A., Beck, M. and Hardcastle, C. (2003). Public-private partnerships:
Managing risk and opportunities, Blackwell Science, Oxford
Algarni, A. M., Arditi, D. and Polat, G. (2007). Build Operate Transfer in
infrastructural projects in the United State. Journal of Construction Engineering and
Management. 133 (10), Pp 728 – 735.
Askar, M.M. and Gab – Allah, A .A (2002). Problem facing parties involved in Build
Operate and Transfer project in Egypt. Journal of Management in Engineering, Vol
18, No 4.
Burger, P. and Hawkesworth, I. (2011). How to attain Value for Money: Comparing
PPP and traditional infrastructure public procurement .OECD Journal on
Budgeting. Volume 1.
Cheung, E., Chan, A.P. and Kajewski, S. (2010). Suitability of procuring large public
works by PPP in Hong Kong. Engineering, Construction and Architectural
Management, Vol.17 Iss: 3 pp.292-308.
Comptroller and Auditor General (2003), PFI: Construction performance. Report by
the comptroller and auditor general, HC 371 Session 2002-2003: 5 February 2003,
London. enquiries@nao.gsi.gov.uk
De Marco, A., Mangano, G. Zou, X. (2012). Factors influencing the equity share of
Built - Operate – Transfers, Built Environment Project and Asset Management, Vol 2. Iss. 1 Pp.5-5
Graham, D. (2011).Value for money in PPP procurement. New South Wales
Treasury.
Haley, G. (1992). Private finance for transportation and infrastructure projects: a View
International Journal of Project Management.Vol.10 No 2.
Kumaraswamy, M.M. and Zheng, X. Q. (2001). Governmental roles in BOT – led
infrastructure development” International Journal of Project Management 19(4), Pp195 – 205
JCT (2008). Deciding on the appropriate JCT contract-practice
Note.www.jctcontracts.com
Li, B. (2003). Risk management of construction public private partnership project,
PhD thesis, Glasgow Caledonian University, Glasgow.
Morris, P. (1994). The management of projects, Thomas Tetford.
Mathonsi, M.D. and Thwala, W.D. (2012). Factors influencing the selection of
procurement systems in the South African construction industry. African Journal of
Business Management vol.6 (10), pp.3583-3594.
Maison H., Melissa, C.Y., Ng Sock H., Shim Mong H., Tay Lee Y. (2006).Factors
influencing the selecting of procurement systems by clients. Proceeding of
International Conference on Construction on Construction Industry, Padang,
Indonesia, 21st June-25th June, 1-10
OECD (2008). Public private partnerships: In pursuit of risk sharing and value for
money, OECD Publishing, Paris.
Ogunlana, S.O. and Dey, P. K. (2004). Selection and application of risk management
tools and techniques for Build –Operate – Transfer project. Industrial Management
and Data Systems. Vol. 104 Iss. 4, PP. 334- 346.
Ojo, A.E. and Gbadebo, M.A. (2012). Critical selection criteria for appropriate
procurement strategy for project delivery in Nigeria. Journal of Emerging Trends
in Economics and Management Sciences.3 (5); 422-428
Onwusonye, S.I.J. (2005). The significance of informal sector in project procurement
methods in enhancing project finance from the money and capital markets, The
Quantity Surveyor, NIQS 54 (31-39)
Pilcher, R. (1992). Principles of Construction Management (3rd edition).McGraw-Hill
Book Company, England.
Shalakany, A. (1996). The legal framework of BOT project under Egyptian law
procurement conference on international contracts of BOT and their amicable
solution Vol. 3.
Schaufelberger, J.E. and Wipadapisut, I. (2003). Alternative financing strategies for
Build – Operate – Transfer project. Journal of Construction Engineering and
Management, 129(2), Pp 205 – 213.
Tiong, R.L.K (1990). BOT projects. Risks and securities. Construction Management
and Economics, PP. 315 - 328.
Navarro, A. (2005), “Build – Operate – Transfer (BOT) Arrangements: The
Experience and Policy Challenges” Discussion Paper Series No. 2005-9.
Wang, S.Q., Tiong, R.L.K., Ting, S.K., and Ashley, D., (2000). Foreign exchange and
revenue risks: Analysis of key contract clauses in China’s BOT Projects.
Construction Management and Economics, 18 (3), pp.311-320
Wilson, D.I., Pelham, N. and Duffield, C.F. (2010). A review of Australian PPP
Governance Structures Journal of Financial Management of Property and
Construction.Vol.15, No.3.pp.198-215.
Zhang, X. (2005). Financial viability analysis and capital structure optimization in
privatized public infrastructure projects. Journal of Construction Engineering and
Management, 131(6), Pp. 656 – 668.
Zhang, X.Q. (2001). Procurement of Privately financed Infrastructure Projects, PhD
Thesis. The University of Hong Kong.