AN ASSESSMENT OF BUILDING ELEMENTS’ PRONENESS TO VARIATION IN NIGERIA

Main Article Content

Babatunde Solomon Olusola
Babalola Olubola
Godwin Onajite Jagboro
Akintayo Opawole

Keywords

Building elements’, Construction, Nigeria, Project delivery, Proneness, Variation

Abstract

Variations in construction had been studied by a number of researchers in the light of its causes and effects on project delivery, thereby taking for granted the susceptibility of building elements to variation. Thus, this paper becomes imperative to fill the gap with a view to examining the proneness of building elements to variation and assessing the control measures of proneness of building elements to variation before and during construction process. Data were collected using structured questionnaires administered on construction professionals in Lagos metropolis. Systematic sampling technique was employed in the administration of the questionnaire to consulting firms, contracting firms and client organizations within the built environment in the study area. The data were analyzed using statistical methods of average, percentage, relative significant index (RSI) and Spearman rank-order correlation coefficient. The results of the analysis revealed that excavation and fillings, concrete work at substructure, block work at substructure, roof and wall finishes were ranked highest of the building elements that were highly susceptible to variation. While internal doors, disposal installation, water installation, ventilation system, windows and external doors respectively were less susceptible to variation during construction processes of educational building projects in Nigeria. The paper further identified involvement of professionals at initial stage of project, client's involvement at planning and design phase, clear and thorough project brief and thorough detailing of design respectively as control measures of proneness of building elements to variation. The study recommended that the identified building elements which have been known to have a high degree of susceptibility to variation are to be given utmost consideration during the design and construction process in order to minimize their effects and contributions to variation with overall aim to improving construction project delivery.

Abstract 84 | PDF Downloads 25

References

Akinsiku O. E. (2006) Assessment of elements’ proneness to variation and its effects on construction cost overruns, Unpublished B.Sc Thesis, Department of Quantity Surveying, Federal University of Technology, Akure.
Aladegbaiye O.B. (2002) A study of the variability of prime cost sums in the bill of quantities for building contracts in south western Nigeria, Unpublished M.Sc. thesis, Department of Quantity Surveying, Obafemi Awolowo University, Ile Ife.
Alan, T. (1997). Building Procurement. Macmillan Press Ltd, London.
Arain, F.M., Assaf, S.A. and Low, S.P. (2004) Causes of discrepancies between design and construction. Architectural Science Review, Vol.47 No.3, 237 249.
Arain, F. M. (2005) Strategic Management of Variation Orders for Institutional Buildings: Leveraging on information technology. Available at http://www.pmi.org/pmief/scholarship/documents/BNS041.pdf(Accessed 4 February 2010).
Assaf, S.A., Al Khalil, M. and Al Hazmi, M. (1995) Causes of delays in large building construction projects. Journal of Construction Engineering and Management, ASCE, 11, 45 50.
Building and Engineering Standard Method of Measurement (BESMM 3) ( 2008), Third Edition. Published by the Nigerian Institute of Quantity Surveyor, Lagos, Nigeria.
Clough, R.H. and Sears, G.A. (1994) Construction Contracting. (6th edition) John Wiley & Sons Inc., New York
Construction Industry Institute (CII) (1986) Constructability: A Primer. Construction Industry Institute, University of Texas at Austin, TX.
Construction Industry Institute (CII) (1994a) Pre project Planning: Beginning a Project the Right Way. Publication 39 1, Construction Industry Institute, University of Texas at Austin, TX.
Construction Industry Institute (CII) (1994b) Project Change Management. Special Publication 43 1, Construction Industry Institute, University of Texas at Austin, TX.
Fisk, E. R. (1997) Construction Project Administration. (5th edition) Prentice Hall, New Jersey.
Hester, W., Kuprenas, J.A. and Chang T.C. (1991) Construction Changes and Change Orders: Their Magnitude and Impact. CII Source Document 66, University of California
Berkeley
Ibbs, C. W., Wong, C.K. and Kwak, Y.H. (2001) Project change management system. Journal of Management in Engineering, ASCE, Vol.17 No.3,159--165
Joint Contract Tribunal (1980) Standard Form of Building Contract, RIBA Publication Ltd
Kaming, P.F., Olomolaiye, P.O., Holt, G.D. & Harris, F.C. (1997) Factors influencing construction time and cost overruns on high rise projects in Indonesia. Construction Management and Economics, Vol.15 No.1, 83--94.
Mbachu, J. I. C, and Folose, M. (2005) Under--representation of women in the South--Africa Construction Inductry, In A.C. Sidwell (Ed.) (Ed(s).), Queensland University of Technology Research Week, Brisbane, QLD, Australia, 4--5th July, 306--316.
Mendelsohn R. (1997) The constructability review process: a constructor`s perspective, Journal of management in Engineering, ASCE, 13, 17--19.
Miresco, E.T. & Pomerol, J.C. (1995) A knowledge--based decision support system for construction project management, Proceedings of the Sixth International Conference on Computing in Civil and Building Engineering, 1501--1507.
Mokhtar, A., Bedard, C. and Fazio, P. (2000) Collaborative planning and scheduling of interrelated design changes. Journal of Architectural Engineering, ASCE, Vol. 6 No.2, 66--75
O’Brien, J. J. (1998) Construction Change Orders. McGraw Hill, New York.
Odeyinka, H.A., Oladapo, A. A., Akindele, O. (2006) Assessing Risk Impacts on Construction Cost, Proceedings of the Annual Research Conference of the Royal Institution of Chartered Surveyors, Held on Thursday 7th and Friday 8th September 2006 at University College, London
Ogunsemi, D.R. and Jagboro, G.O. (2006) Time--cost model for building projects in Nigeria, Journal of Construction Management and Economics, Vol.24, 253––258.
Robert, P.C. and Harold, E.M. (1999) UNIFORMAT II Elemental Classification for Building Specifications, Cost Estimating, and Cost Analysis Available at
http://www.bfrl.nist.gov/oae/publications/nistirs/6389.pdf (Accessed 20 January 2011).
Seeley, H.I. (1997) Quantity Surveying Practice, Macmillan Publisher, London.
Ssegawa J. K., Mfolwe K. M., Makuke B. and Kutua B. (2002) Construction Variations: A Scourge or a necessity? Proceedings of the First International Conference of CIB W107, 11--13 Nov 2002, Cape Town –– South Africa, 87--96. (Available at
http://buildnet.csir.co.za/cdcproc/docs/3rd/ssegawa_jk_mfolwe_km.pdf (Accessed 4 February 2011).
Standard Form of Building Contract (1990). Published by Federal Ministry of Works. Lagos, Nigeria.
Trochim, W. M. (2000) The Research Methods Knowledge Base, 2nd Edition. [online] Available from http://trochim.human.cornell.edu/kb/index.htm (Accessed 17 December 2010).

Similar Articles

21-30 of 209

You may also start an advanced similarity search for this article.