CONTRIBUTORS TO SCHEDULE DELAYS IN PUBLIC CONSTRUCTION PROJECTS IN SAUDI ARABIA: OWNERS’ PERSPECTIVE

Main Article Content

Ibrahim Mahamid

Keywords

Delays, construction, public owners, contributors, risk map

Abstract

This study aims at identifying the contributors to delays in public construction projects in Saudi Arabia from owners’ viewpoint. To do so, 22 public owners of construction projects completed a structured questionnaire survey. 35 factors were identified through literature review. The results indicated that the top delay contributors are: bid award for lowest price, poor site management, poor communication and coordination between construction parties, payments delay, poor labor productivity, and rework. These findings can support the Government in improving the regulations to meet the construction market needs, owners in planning and designing and evaluating policy, contractors and managers in planning and taking external and internal risks when costing and scheduling contracts, consultants in applying comprehensive contract information, and workers in conducting their day-to-day activities. Results will fill an important research and practice gap and help in improving time performance in public construction projects in Saudi Arabia and other developing countries.

Abstract 257 | PDF Downloads 259

References

Alghbari, W., Razali, M., Salim, A., and Ernawati (2007). The significant factors causing delay
of building construction projects in Malaysia. Journal of Engineering, Construction and
Architectural Management, 14(2), 192-206.
Al-Khalil, M. and Al-Ghafly, M. (1999). Important causes of delay in public utility projects in
Saudi Arabia. Construction Management and Economics, 17(5), 647–55.
Al-Momani, A. (2000). Construction delay: a quantitative analysis. International Journal of
Project Management, 18(1), 51–9.
Al-Najjar, J. (2008). Factors influencing time and cost overruns on construction projects in the
Gaza Strip. Master thesis, Islamic University, Gaza.
Al-Kharashi, A. and Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector
construction projects. Construction Management and Economics, 27(1): 3 – 23.
Amehl, O., Soyingbe, A., and Odusami, K. (2010). Significant factors causing cost overruns
in telecommunication projects in Nigeria. Journal of Construction in Developing
Countries, Vol. 15.
Assaf, S. and Al-Hejji, S. (2006). Causes of Delay in large construction projects. International
Journal of Project Management, 24, 349-357.
Chan, E. (2007). Corporate portals as extranet support for the construction industry in Hong
Kong and nearby regions of China. ITcon; Special Issue Construction information
technology in emerging economies, 12, 181-192.
Chapman, R. (2001). The controlling influences on effective risk identification and assessment
for construction design management. International Journal of Project Management, 19,
147-160.
Enshassi, A. and Abu Mosa, J. (2008). Risk Management in Building Projects: Owners’
Perspective. The Islamic University Journal, 16(1), 95-123.
Faridi, A. and El-Sayegh, S. (2006). Significant contributors causing delay in the UAE
construction industry. Construction Management and Economics, 14, 1167-76.
Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). Causes of delay and cost overruns in
construction of groundwater projects in a developing countries; Ghana as a case study.
International Journal of Project Management, 21, 321 – 326.
Jackson, B. (2010). Construction Management Jump Start. Second Edition. Indianapolis,
Indiana: Wiley Publishing, Inc.; 386 p.
Koushki, P., Al-Rashid, K., and Kartam, N. (2005). Delays and cost increases in the
construction of private residential projects in Kuwait. Construction Management and
Economics, 23(3), 285-294.
Mahamid, I. (2011). Risk Matrix for Factors Affecting Time Delay in Road Construction
Projects: Owners’ Perspective. Engineering, Construction and Architectural
Management, 18 (6), 609 – 617.
Mahamid, I., Bruland, A., and Dmaidi, N. (2012). Delay causes in road construction projects.
ASCE Journal of Management in Engineering, 28(3), 300–310.
Odeh, A. and Battaineh, H. (2002). Causes of construction delay: traditional contracts.
International Journal of Project Management, 20(1), 67-73.

Similar Articles

1-10 of 186

You may also start an advanced similarity search for this article.