ESTIMATING COST CONTINGENCY FOR CONSTRUCTION PROJECTS: THE CHALLENGE OF SYSTEMIC AND PROJECT SPECIFIC RISK

Main Article Content

J.I.T Buertey
Emmanuel Abeere-Inga
Theophilus Adjei Kumi

Keywords

Risk, Uncertainties, Project specific, Systemic risk, Contingency, Epistemic uncertainty

Abstract

The challenge of poor scope definition resulting in scope creep is recognized as the major driver for construction project and cost overruns. All construction projects are associated with both systemic uncertainty and project specific uncertainty. The epistemic ambiguity in risk estimation could be considered as an opportunity or threat, a gain or loss, positive or negative; while project specific risk are in relation to project cost which makes its estimation untoward. Out of 204 questionnaires distributed to the Built Environment Professionals to determine the impact of systemic and project specific risk factors on the estimation of cost contingency, 118 were retrieved representing 57.8%. Data analysis using FMEA as a qualitative risk tool and univariate statistical analysis as a quantitative risk tool revealed that systemic risk accounted for approximately 64% of the cost drivers related of the construction cost uncertainty whilst projects specific risk accounted for 36% of the risk impact. Scope changes, incomplete scope definition, design status and changes in specification were revealed as high-impact systemic risk which has a high propensity of cost overrun effect on cost contingency. The impact of systemic risks can be managed through a design management effort by confirming the certainty of owner related issues during project definition and planning stage through historical based models relying on organizational process asset. The research revealed that the effect of project specific risk including natural and force majeure conditions and economic indicators are beyond the prediction and stochasticity effort of the project team. Project specific risk can be managed only through collaborative communicative effort of the project team with simulation to enable the right construction technologies to be selected and risk impact to be curtailed.

Abstract 100 | PDF Downloads 171

References

Ali, Rashed (2005), The Application of risk management in infrastructural construction
projects, Journal of Cost Engineering Vo. 47/No. 8 pp 20—27
Association for the Advancement of Cost Engineering (AACE), (1998), Construction cost
estimating working manual
Aibinu, A A., Jagboro, G.O (2002), The effects of construction delays on project delivery in
Nigerian construction industry. International Journal of Project Management, 20, 593-
599.
Baccarini, David (2004), Accuracy In Estimating Project Cost Construction Contingency- A
Statistical Analysis Cobra 2004: The Int. Construction Research Conf. of the Royal
Institution of Chartered Surveyors International conference, 7th-8th September 2004,
Leeds Metropolitan Univ. Leeds, U.K.
Chen, D and Hartman, F T (2000), A neural network approach to risk assessment and
contingency allocation. ACCE Transactions, Risk. 07.01-6.
Clark, D.E (2001). Monte Carlo analysis: ten years of experience. Cost Engineering, 43(6),
40-45.
Clark, G.M. and Cook, D. (1998). A basic course in statistics. 4th Ed, New York, Arnold.
Curran, M W (1989) Range Estimating, Cost Engineering, 31(3), 18-26.
Dey, P., Tabucanon, M T and Ogunlana, S O ((1994). Planning for project control through
risk analysis; a petroleum pipe laying project, International Journal of Project
Management, 12(1), 23-33.
Diekmann, J.E. and Featherman, W.D (1998). Assessing cost uncertainty: lessons from
environmental restoration projects, Journal of Construction Engineering and
Management, 124 (6), 445-451.
Diekmann, J.E. (1983). Probabilistic estimating: mathematics and applications, Journal of
Construction Engineering and Management, 109(3), 297-308.
Gil, Nuno., Tether, R. Bruce (2011), Project risk management and design flexibility:
analyzing a case and condition of complementarily, Research Policy, 40,pp 415-428.
Gunhan, S., and Arditi, D. (2007), Avoiding change orders in public school construction.
J.Profl. Issues Eng. Educ.Pract., 133(1), 67-73.
Hackney, JW (1985). Applied contingency analysis, AACE Transactions, B.1-4
Hervet, Lyle (2011), Contingency risk model, A Black and Veatch business excellence review,
Palisade @risk Conference by the AACE
Hollmann, John, (2009), Recommended Practice for Risk Analysis and cost Contingency
Estimation, Association for the Advancement of Cost Engineering (AACE), Working
Maual
Keith, R Molenaar, (2011), a risk based approach to contingency estimating in highway
project development, American Society of Civil Engineers, pp 786-795
Keith, R Molenaar, (2005), Programmatic cost risk analysis for highway megaprojects. J.
Constr. Manage,131, 343.
Keith, R Molenaar, (2007), Management practice to control transportation project cost. Cost
estimating and cost management in the planning process capacity building workshop,
Minneapolis, November 16th 2007
Kumar, R. (1999), Research methodology: A step by step guide for beginners, London,
SAGE Publications
Leach L P (2003), Schedule and cost buffer sizing: how to account for the bias between
project performance and your model. Project Management Journal, 34(2), 34-47.
Lorance, R B and Wendling, R V (1999), Basic techniques for analyzing and presenting cost
risk analysis, AACE Transactions, Risk. 01. 1-7
Merrow E W and Yarossi M E (1990), Assessing Project cost and schedule risk, AACE
Transactions, H.6.2-7
Moselhi O (1997), Risk assessment and contingency estimating, ACCE Transactions,
D&RM/A.06.1-6
Oberlender GD and Trost S M (2001). Predicting accuracy of early cost estimates based on
estimate quality, Journal of Construction Engineering and Management, 127(3), 173-
182
Patrascu Anghel (1998), construction cost engineering hand book, Mercel Dekker Inc, New
York
Park K. Hyung, Seung H. Han, Jeffery S. Russell (2005), “Cash Flow Prediction Model For
General Contractors Using Moving Weights Of Cost Categories”, Journal of
Management in Engineering, ASCE, 072-597X pp 164-172
Perminova, Olga., Gustafsson, Magnus., Wikstrom, Kim, (2008). Defining Uncertainty in
projects- a new perspective, Journal of Project Management, 26, 73-78.
Project Management Institute, (2009), A Guide to the Project Management Body of
Knowledge. Newton Square, PA, PMI.
Russell J.S. (1991), “Contractor’s failure”: Analysis J. perform Constr. Facility., 5(2), 163-
180
Sonmez Rifat (2007), Qualitative methodology for determination of cost contingency in
international projects, Journal of Management in Engineering, p 35-39
Touran, A. (2003), “Probability model for cost contingency.” J. Constr. Eng. Manage., 129(3),
280-284.
Williams T P (2003). Predicting final cost for competitively bid construction projects using
regression models, International Journal of Project Management, 21, 593-599
Yeo K T (1990). Risks, classification of estimates, and contingency management. Journal of
Management in Engineering, 6(4), 458-470
Xuequing Zhang, (2005), “Critical Success Factor for Public- Private Partnership in
Infrastructure”. Journal of Construction Engineering and Management, Volume 131,
Issue 1, pp 3-14

Similar Articles

1-10 of 114

You may also start an advanced similarity search for this article.