ASSESSING THE IMPACT OF DELAYS ON THE PRODUCTIVITY OF CONCRETE PLACEMENT BY CRANES IN NIGERIA

Main Article Content

Olaoluwa Olatunde
Ojo Stephen Okunola
Adesanya David Abiodun

Keywords

concrete placement, crane, delays, impact, Nigeria, productivity

Abstract

Infrastructural construction investment in Nigeria is currently estimated at US$5bn annually and of the key trades in the industry, concreting makes up about 15% of the total frequency of operations. One of the most dominant concrete-placement methods in Nigeria is by crane and skip and it has been established that fractional delay (delay time expressed as a fraction of pour duration) is the most significant factor affecting its productivity. This study therefore focused on evaluating the extent of delays on craned concrete placement in Nigeria and determining their effects on concreting productivity. The study involved a close observation of 35 daily concrete pours placed by crane and skip on 25 project sites selected through stratified random sampling procedure in Lagos. Productivity data obtained were analysed by multiple regression to obtain a model relating productivity to fractional delay. The results showed an average delay of above 23% of the pour time while the productivity is reduced by more than 2.5 m3/h for every 10% increase in delay. The latter is over 5 times the productivity reduction obtained in Hong Kong study for the same percentage increase in delay and confirms that delay has a far greater impact on the productivity of concrete placement by cranes in Nigeria than in other countries. It was recommended that serious, and concerted, managerial actions be directed at proper planning and scheduling of material deliveries as well as labour and equipment inputs by adopting the developed model to monitor and eliminate most delays and sustain productivity.

Abstract 68 | PDF Downloads 41

References

Abd, S.M., Abd, A.M., Hj, M.F., Zain, M.,and Ismail, A. (2008) Development of productivity
assessment methodology for concreting process. ARPN Journal of Engineering and Applied
Sciences, 3(5), 1 7.
Ameh, O. J. and Odusami, K.T. (2002) Factors affecting labour productivity in the Nigerian construction industry A case study of indigenous contracting organization in Lagos. Journal of the Nigerian Institution of Quantity Surveyors, July September, 14 18.
Anson, M. Wang S.Q and Wang, I.S. (1996) The Concreting of Hong Kong Buildings A Study of Ready Mixed Concrete Supply and Site Placing. Research Report, Dept. of Civil and Structural Engineering, HKPU.
Anson, M. and Wang, S.Q. (1998) Performance of concrete placing in Hong Kong buildings. Journal of Construction Engineering & Management, ASCE, 124(2), 116 124.
Chan, D.W. and Kumaraswamy, M.M. (1995) A study of the factors affecting construction duration in Hong Kong. Construction Management and Economics, 13, 319 333.
Dunlop, P. and Smith, S.A. (2000) Non deterministic investigation of the concrete placing system. Proceedings 8th Annual Conference of the International Group for Lean Construction, 17 19 July, 2000, Brighton, England.
Dunlop, P. and Smith, S.A. (2003) Estimating key characteristics of the concrete delivery and process using linear regression analysis. Civil Engineering and Environmental Systems, 20(4), 273 290.
Fagbenle, O.I., Adeyemi, A.Y. and Adesanya, D.A. (2004) The impact of non financial incentives on bricklayers’ productivity in Nigeria. Journal of Construction Management and Economics, 22(9), 899 911.
Graham, D., Smith, S.D. and Tommelein, I.D. (2005) Cost of concrete placement for contractors. Proceedings, 21st Annual Association of Researchers in Construction Management (ARCOM), Conference, 7 9 September 2005, University of Salford, London. (2), 993 1003.
Kendrick, J.W. (1977) Understanding Productivity, an Introduction to the Dynamics of Productivity Change. John Hopkins University Press. Baltimore Maryland.
Mali, P. (1978) Improving Total Productivity, MBO Strategies for Business, Government, and Not
For Profit Organizations. John Wiley & Sons: New York.
Mendenhall, W., Ott, L. and Scheaffer, R. L., (1971) Elementary Survey Sampling. Woodsworth Publishing Company: Belmont.
Nigeria Infrastructure Report Q2 (2009) Industry Research Report. Published by Business Monitor International, March, 2009.
Ok, S.C. and Sinha, S.K. (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), 1029 –– 1044.
Olaoluwa, O. (2008) Productivity Study of In--Situ Concreting Operations on Building Construction Sites in Lagos State, Nigeria. Unpublished M.Sc. Thesis, Department of Building, Obafemi Awolowo University, Ile--Ife, Nigeria.
Olaoluwa, O. and Adeyemi, Y.A. (2009) Effects of placing methods on concreting productivity in Nigeria. Proceedings, BIE 11th Biennial Conference, 02--09 October 2009, Gaborone, Botswana.
Olaoluwa, O. and Adeyemi, Y.A. and Lawal, A. (2010) Factors influencing the productivity of concrete placing by cranes in Nigeria. Global Journal of Researches in Engineering, 10(1), 52--58.
Olomolaiye, P.O. (1984) Comparative Studies of Output and Productivity of Key Trade in Selected Number of Building Sites. Unpublished M.Sc. Thesis, Department of Building, Obafemi Awolowo University, Ile--Ife, Nigeria.
Oluwadiya, K.S. (2004) Getting to Know SPSS. Jovin Express Communication Ltd., Ikeja, Lagos.
Proverbs, D.G., Holt, G.D. and Olomolaiye, P.O. (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Journal of Construction Management and Economics, (17), 577--587.
Tabatchnick, B.G. and Fidell, L.S. (1996) Using Multivariate Statistics (3rd Edn) Harper Collins College Publishers: New York.
Wang, S.Q. (1995) A Methodology for Comparing the Productivities of RMC Industries in Major Cities. Ph.D. Dissertation, The Hong Kong Polytechnic University, Hong Kong.
Wang, S.Q. (1999). Improving construction productivity by management. Proceedings 2nd International Conference on Construction Industry Development and 1st Conference of CIB TG29 on Construction in Developing Countries: Construction Industry Development in the New Millennium, 27--29 October, The Pan Pacific Hotel, Singapore, 419--429.
Wang S. Q., Ofori G. and Teo, C.L. (2001) Productivity of ready mixed concrete placing in Singapore. Journal of Construction Research, (2), 53--62.

Similar Articles

1-10 of 129

You may also start an advanced similarity search for this article.