(1)
IS THE LONGBOW BETTER THAN THE CROSSBOW? EMERGING ISSUES FROM MOBILISING A LONGITUDINAL STUDY ON A MEGAPROJECT. JCPMI 2017, 7 (2), 2054-2065. https://doi.org/10.36615/jcpmi.v7i2.134.